Hire a good rigger, buy once and cry once. Well worth the money.I'm not willing to run out and buy a heavy duty dolly for this one move, and I'm not willing to move this on my own. The pipes should work, but it would be a pain in the ass. floors not exactly level, and the cast iron frame only makes contact at four points. maybe 4x6" at each point. So the pipes would be a pain.
Would rather just hire someone to come out and get it done.