I have looked at the cost of tools i need to do the job, and the cost of having it done. Normally i like doing the job myself, but with the current projects, i can't justify doing it. I also do not want to wait 8 plus weeks to have it done. I have a virgin Romy barrel and a cut barrel with all the goodies.